Q.

The correct sequence of drilling equipment for increasing size of holes in tunnels is

  • AWagon drill, churn drill, shot drill
  • BWagon drill, shot drill, churn drill
  • CShot drill, churn drill, wagon drill
  • DChurn drill, wagon drill, shot drill
Correct Answer : (A)

Wagon drill, churn drill, shot drill

Hints :
Previous

Drift method of tunneling is used to construct tunnels in

Next

As compared to a single free face, if a charge of explosive is placed equidistant from two faces, then the yield

Join The Discussion