Q.

Which one of the following methods is adopted for permanent drainage of tunnels?

  • AProvision of longitudinal drains
  • BContinuous open drains
  • CConcrete lining
  • DAll the above
Correct Answer : (D)

All the above

Hints :
Previous

Drift method of tunneling is used to construct tunnels in

Next

As compared to a single free face, if a charge of explosive is placed equidistant from two faces, then the yield

Join The Discussion