Single bus-bar arrangement
All of the above
Single bus-bar arrangement Is cheapest in initial as well as maintenance cost, Provides simple operation and relaying system and has the drawback that there will be complete shutdown when fault occurs on the bus itself.
The most serious consequence of a major uncleared short-circuit fault could be
Which of the following results in a symmetrical fault?