Q.

The term “Critical clearing time”  for a fault in a power system  is related to 

  • AReactive power limit
  • BTransient stability limit 
  • CShort-circuit current limit
  • DSteady-state stability limit 
Correct Answer : (B)

Transient stability limit 

Hints :
Previous

The most serious consequence of a major uncleared short-circuit fault could be

Next

Which of the following results in a symmetrical fault?

Join The Discussion