Q.

An open belt drive is used when

  • AShafts are arranged at right angles and rotate in one definite direction
  • BShafts are arranged parallel and rotate in the opposite directions
  • CShafts are arranged parallel and rotate in the same directions
  • DDriven shaft is to be started or stopped whenever desired without interfering with the driving shaft
Correct Answer : (C)

Shafts are arranged parallel and rotate in the same directions

Hints :
Previous

For high speed engines, the cam follower should move with

Next

The maximum shear stress theory is used for

Join The Discussion