Q.

During load shedding

  • ASystem voltage is reduced
  • BSystem frequency is reduced
  • CSystem loads are switched off
  • DSystem power factor is changed
Correct Answer : (C)

System loads are switched off

Hints :
Previous

The commercial sources of energy are

Next

Which of the following power plants is the least reliable?

Join The Discussion