1.A diesel power plant is generally used as

  • ABase load plant
  • BPeak load plant
  • CStandby plant/emergency plant 
  • DAny of the above
Answer / Hint Save Question Comment On Question
Correct Answer : (C)

Standby plant/emergency plant 

Explanation:

2.A gas turbine power plant is best suited for

  • ABase loads
  • BPeak loads
  • CEmergency
  • DNone of the above
Answer / Hint Save Question Comment On Question
Correct Answer : (B)

Peak loads

Explanation:

3.For the same cylinder dimensions and same rpm, which of the following engines will produce least power?

  • APetrol engine
  • BDiesel engine
  • CSupercharged engine
  • DNone of the above
Answer / Hint Save Question
Correct Answer : (A)

Petrol engine

Explanation:

4.Ships are usually supplied power by

  • ASteam accumulators
  • BHydraulic turbine
  • CDiesel engines
  • DNone of the above
Answer / Hint Save Question Comment On Question
Correct Answer : (C)

Diesel engines

Explanation:

Ships are usually supplied power by Diesel engines.

5.Gas turbine power plants for maximum efficiency may have

  • AHeat exchanges
  • BMultistage compression
  • CReheating
  • DAll of the above
Answer / Hint Save Question
Correct Answer : (D)

All of the above

Explanation:

6.Air will not be the working substance  in a

  • AClosed cycle gas turbine
  • BOpen cycle gas turbine
  • CPetrol engine
  • DDiesel engine
Answer / Hint Save Question Comment On Question
Correct Answer : (A)

Closed cycle gas turbine

Explanation:

7.Which of the following plants can never have 100 percent load factor?

  • ANuclear power plant
  • BHydroelectric power plant
  • CBase load plant
  • DPeak load plant
Answer / Hint Save Question
Correct Answer : (D)

Peak load plant

Explanation:

8.Which of the following power plants needs highly skilled/qualified engineers for its operation?

  • AHydro
  • BSteam
  • CNuclear
  • DGas turbine
Answer / Hint Save Question
Correct Answer : (C)

Nuclear

Explanation:

9.Which of the following power plants will take long period in erection and installation?

  • ASteam
  • BHydro
  • CNuclear
  • DGas turbine
Answer / Hint Save Question
Correct Answer : (B)

Hydro

Explanation:

10.Major share of power generated in India is through

  • AHydroelectric power plants
  • BNuclear power plants
  • CThermal power plants
  • DGas turbine power plants
Answer / Hint Save Question
Correct Answer : (C)

Thermal power plants

Explanation:

11.The generating station suitable to operate as peak load plant is

  • AThermal power station
  • BNuclear power station
  • CPumped storage power station
  • DNone of these
Answer / Hint Save Question
Correct Answer : (C)

Pumped storage power station

Explanation:

12.Shunt capacitors in a substation

  • AConsume lagging VAR
  • BDeliver lagging VAR
  • CConsume active power
  • DDeliveractive power
Answer / Hint Save Question
Correct Answer : (B)

Deliver lagging VAR

Explanation:

13.The principle of incremental costs is employed for deciding the

  • ASequence of adding units
  • BLoad allocation between units in operation
  • CTotal plant capacity to be operated
  • DAll of the above
Answer / Hint Save Question
Correct Answer : (B)

Load allocation between units in operation

Explanation:

14.During load shedding

  • ASystem voltage is reduced
  • BSystem frequency is reduced
  • CSystem loads are switched off
  • DSystem power factor is changed
Answer / Hint Save Question Comment On Question
Correct Answer : (C)

System loads are switched off

Explanation:

15.Load shedding is done for

  • AReducing peak demand on the system
  • BRepairing of machines
  • CPower factor improvement
  • DEfficient operation equipment
Answer / Hint Save Question Comment On Question
Correct Answer : (A)

Reducing peak demand on the system

Explanation: