Q.

A CPM family includes

  • ACPA (Critical Path Analysis)
  • BCPP (Critical Path Plotted)
  • CCPS (Critical Path Scheduling)
  • DAll of the above
Correct Answer : (D)

All of the above

Hints :
Previous

A dummy activity

Next

The term 'value' in value engineering refers to

Join The Discussion