Q.

M.T.M. is used to

  • AImprove existing methods
  • BEstablish time standards
  • CDevelop effective methods in advance of the beginning of production
  • DAll of the above
Correct Answer : (D)

All of the above

Hints :
Previous

A dummy activity

Next

The term 'value' in value engineering refers to

Join The Discussion