Q.

'O' on a PERT/CPM chart represents

  • AAn ordinary event
  • BA significant event representing some milestone
  • CAn event to be transferred to other network chart
  • DDangling event
Correct Answer : (A)

An ordinary event

Hints :
Previous

The work study is done by means of

Next

In break-even analysis, total cost consists of

Join The Discussion