Q.

The term 'value' in value engineering refers to

  • ATotal cost of the product
  • BSelling price of the product
  • CUtility of the product
  • DManufactured cost of the product
Correct Answer : (C)

Utility of the product

Hints :
Previous

A dummy activity

Next

PMTP (predetermined motion time systems) include

Join The Discussion