Q.

Time study is used to

  • ADetermine standard costs
  • BDetermine the number of machines a person may run
  • CProvide a basis for setting piece price or incentive wages
  • DAll of the above
Correct Answer : (D)

All of the above

Hints :
Previous

A dummy activity

Next

The term 'value' in value engineering refers to

Join The Discussion