Q.

Actual performance of a task is called

  • AAn event
  • BAn activity
  • CA duration
  • DNone of these
Correct Answer : (B)

An activity

Hints :
Previous

The work study is done by means of

Next

In break-even analysis, total cost consists of

Join The Discussion