1.Basic tool in work study is

  • AGraph paper
  • BProcess chart
  • CPlanning chart
  • DStop watch
Answer / Hint Save Question Comment On Question
Correct Answer : (D)

Stop watch

Explanation:

2.Which of the following organizations is best suited for steel plants

  • AFunctional organization
  • BLine organization
  • CStaff organization
  • DLine, staff and functional organizations
Answer / Hint Save Question Comment On Question
Correct Answer : (D)

Line, staff and functional organizations

Explanation:

3.Indirect expenses include

  • AFactory expenses
  • BSelling expenses
  • CAdministrative expenses
  • DAll of these
Answer / Hint Save Question Comment On Question
Correct Answer : (D)

All of these

Explanation:

4.Direct expenses include

  • AFactory expenses
  • BSelling expenses
  • CAdministrative expenses
  • DNone of these
Answer / Hint Save Question Comment On Question
Correct Answer : (D)

None of these

Explanation:

5.The time required to complete a job is established and a bonus is paid to the worker based on the exact % of time saved. This type of incentive plan is known as

  • ADry work Plan
  • BHalsey Premium Plan
  • CTaylor Plan
  • DRowan Plan
Answer / Hint Save Question Comment On Question
Correct Answer : (D)

Rowan Plan

Explanation:

6.In Emerson's efficiency plan of wage incentive system, bonus is paid to a worker

  • AWhose output exceeds 67% efficiency
  • BOn the percentage of time saved
  • COn the percentage of time worked
  • DOn the percentage of standard time
Answer / Hint Save Question Comment On Question
Correct Answer : (A)

Whose output exceeds 67% efficiency

Explanation:

7.According to Rowan plan of wage incentive system, bonus is paid to a worker

  • AWhose output exceeds 67% efficiency
  • BOn the percentage of time saved
  • COn the percentage of time worked
  • DOn the percentage of standard time
Answer / Hint Save Question Comment On Question
Correct Answer : (C)

On the percentage of time worked

Explanation:

8.Statistical quality control techniques are based on the theory of

  • AQuality
  • BStatistics
  • CProbability
  • DAll of the above
Answer / Hint Save Question Comment On Question
Correct Answer : (C)

Probability

Explanation:

9.Pick up the incorrect statement about advantages of work sampling

  • APermits a fine breakdown of activities and delays
  • BSimultaneous study of many operators may be made by a single observer
  • CCalculations are easier, method is economical and less time consuming
  • DNo time measuring devices are generally needed
Answer / Hint Save Question Comment On Question
Correct Answer : (A)

Permits a fine breakdown of activities and delays

Explanation:

10.In CPM, the cost slope is determined by

  • ACrash cost/Normal Cost
  • B(Crash Cost - Normal cost)/ (Normal time - Crash time)
  • CNormal Cost/Crash cost
  • D(Normal cost - Crash cost)/ (Normal time - Crash time)
Answer / Hint Save Question Comment On Question
Correct Answer : (B)

(Crash Cost - Normal cost)/ (Normal time - Crash time)

Explanation:

11.The employees provident fund act is applicable to

  • AAll industries
  • BAll industries other than small and medium industries
  • CVolunteers
  • DThe industries notified by Government
Answer / Hint Save Question Comment On Question
Correct Answer : (D)

The industries notified by Government

Explanation:

12.Product layout is also known as

  • AAnalytical layout
  • BSynthetic layout
  • CStatic product layout
  • DNone of these
Answer / Hint Save Question Comment On Question
Correct Answer : (B)

Synthetic layout

Explanation:

13.Process layout is also known as

  • AAnalytical-layout
  • BSynthetic layout
  • CStatic product layout
  • DNone of these
Answer / Hint Save Question Comment On Question
Correct Answer : (A)

Analytical-layout

Explanation:

14.Fixed position layout is also known as

  • AAnalytical layout
  • BSynthetic layout
  • CStatic product layout
  • DNone of these
Answer / Hint Save Question Comment On Question
Correct Answer : (C)

Static product layout

Explanation:

15.Which of the following depreciation system ensures that the interest be charged on the cost of machine asset every year on the book value, but the rate of depreciation every year remains constant

  • ASinking fund method
  • BStraight line method
  • CABC charging method
  • DAnnuity charging method
Answer / Hint Save Question
Correct Answer : (D)

Annuity charging method

Explanation:

16.Pick up the incorrect statement from the following. A critical ratio scheduling

  • AEstablishes the relative priorities among various activities on a common basis
  • BDetermines the status of each activity
  • CAdjusts automatically changes in activity progress
  • DNone of the above
Answer / Hint Save Question Comment On Question
Correct Answer : (D)

None of the above

Explanation:

17.Monte Carlo solutions in queuing theory are extremely useful in queuing problems

  • AThat can't be analysed mathematically
  • BInvolving multistage queuing
  • CTo verify mathematical results
  • DAll of the above
Answer / Hint Save Question Comment On Question
Correct Answer : (A)

That can't be analysed mathematically

Explanation:

18.The break-even point represents

  • AThe most economical level of operation of any industry
  • BThe time when unit can run without any loss and profit
  • CTime when industry will undergo loss
  • DThe time when company can make maximum profits
Answer / Hint Save Question Comment On Question
Correct Answer : (B)

The time when unit can run without any loss and profit

Explanation:

19.The time required to complete a task is established and a bonus is paid to the worker for every hour he saves from the established time required. This type of incentive plan is known as

  • ARowan Plan
  • BTaylor Differential Piece rate system
  • CHalsey Premium plan
  • DDay work plan
Answer / Hint Save Question Comment On Question
Correct Answer : (C)

Halsey Premium plan

Explanation:

20.Father of industrial engineering is

  • AJack Gilbert
  • BHenry Laurence Gantt
  • CFrederick Taylor
  • DIsaac Newton
Answer / Hint Save Question Comment On Question
Correct Answer : (C)

Frederick Taylor

Explanation: